ROADS. FOOTPATHS. DRAINS. ACCOUNTABILITY.
On 11 September 2026, we took a walk through Prabhag 12 along with our ward Corporators Smt. Nivedita Ekbote and Smt. Amruta Mhetre, and Ghole Road Ward Office Head Shri. Balasaheb Patil, to see first-hand the condition of our roads, footpaths and drains under the Ghole Road Ward Office.
What we discussed is obvious — the current state and quality of several roads, drains and footpaths is simply unacceptable. We placed a clear demand before the Ward Office: road repair works must be transparent, accountable and carried out to the highest standards.
For every road repair project, citizens should be able to see:
Name of the contractor undertaking the work
Contractor’s contact number
Start date & expected completion date
Cost of the project
Defect Liability Period
Details of the agency responsible for quality control and supervision.
Also
-All new relaying work must include proper leveling.
- Before any new repair or resurfacing, existing roads must be properly scrapped, dug up and the damaged material removed, rather than simply covering poor-quality surfaces with another layer of poor quality work.
- Manhole levels must be maintained during every road repair so that they remain flush with the finished road surface and do not create hazards for motorists, pedestrians or cyclists.
- During repair works, there must also be proper mapping and documentation of all underlying cables, water and sewerage pipes, drains and other utilities, so that essential infrastructure is not damaged and future repairs are not made more difficult.
- Patchwork must be of such high quality that it is difficult to make out any difference between the repaired portion and the surrounding road surface.
- Temporary, uneven or visibly inferior repairs are not acceptable.
We also demanded greater accountability, transparency, proper quality control and continuous monitoring of civic works.
Public money is being spent on these projects. Citizens have the right to know who is doing the work, how much is being spent, when it will be completed, what standards are being followed and who will be responsible when the work fails.
Good roads and footpaths are not a favour.